A. Yes however as damp is coming from outside we would recommend that the internal floor is also covered – from floor up the wall. Then a Concrete floor would be required approx 6” on top of the CromaSeal along with an internal block wall to be filled with green concrete to ensure the CromaSeal is not ‘blown’ up from the floor of the wall due to water/damp pressure.